PROJECT GUIDE

Start with the job you're doing.

Use these recommendations as a starting point. We'll confirm the best material after learning about your ground conditions, depth, traffic, and finish.

COMMON PROJECTS

What are you building?

01

RECOMMENDED STARTING POINT

Refresh a driveway or lane

5/8" Minus or 3/4" Minus

A practical starting point for filling potholes, resurfacing, and creating a compactable driving surface.

Request a quote
02

RECOMMENDED STARTING POINT

Build a new driveway

1.25" Minus or 2" Minus

Larger material can establish a stronger base before a smaller minus gravel is placed as the finish layer.

Request a quote
03

RECOMMENDED STARTING POINT

Prepare a building pad

1.25" Minus or 2" Minus

A common starting range for shop approaches, pads, and other projects that need a substantial compacted base.

Request a quote
04

RECOMMENDED STARTING POINT

Fill a rough track or low area

Track Fill

The economical option for filling, rough access, and places where volume matters most.

Request a quote
05

RECOMMENDED STARTING POINT

Heavy base or stabilization

2" Minus or 3" Minus

Larger material is often used first where the ground is rough, soft, or needs a deeper structural layer.

Request a quote